STUDIES
OFFICE
- Feasibility studies and optimization
- Design and sizing
- Execution studies
- Support and technical adviceS
Contact UsOUR ACHIEVEMENTS
Project of the Société Autoroutière du Gabon (SAG)
Disruption of the electrical network between PK24 and PK40
For road widening works, we have carried out: The construction of a new electrical network following the new configuration of the population and the installation of new substations and luminaires for public lighting along the modernized track.


Project SEEG
Rehabilitation of a new drinking water treatment plant.
Potable Water Supply in OKONDJA
To improve access to drinking water in the region, we have made many changes such as: the replacement of pumps, the pump supply box, engines, water analysis bins and many others but also, ensured the installation of pipes for water supply from the treatment plant, compliance with standards and securing the facilities to ensure distribution in accordance with health requirements.
Project GSEZ
Displacement of the HTA/BT electrical network for the bypass track drawn
From Camp de Gaule to OKALA roundabout
We intervened for: the construction of a new electrical network and connection to existing networks.